Chemetall Building
Indispensable Need for Close Cooperation between M&E Engineering and Architectural Planning
Trakehner Straße 5, Frankfurt am Main
Use:Lab, office
Year built:1997
Floor area:22,500 sqm
Plot size:11,500 sqm
Investment volume:€40m
Architect:JSK International, Frankfurt am Main
Year built:1997
Floor area:22,500 sqm
Plot size:11,500 sqm
Investment volume:€40m
Architect:JSK International, Frankfurt am Main
Specification
In a project that involved the entire planning process, the complex building permit approval, the construction execution, and the installation of all operation-critical fixtures, just 18 months passed between signing the contract and moving in. By closely cooperating with Chemetall, the Fay experts stayed abreast of the road map at all times, finishing exactly on time. Although the lab equipment posed particular challenges for the mechanical and electrical services, these were taken into account as early as the architectural design stage.